<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Building Progress - The National Railway Museum of New Zealand</title>
	<atom:link href="https://www.nationalrailwaymuseum.nz/category/building-progress/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.nationalrailwaymuseum.nz/category/building-progress/</link>
	<description>Dedicated to preserving New Zealand's Railway heritage for all to enjoy</description>
	<lastBuildDate>Fri, 26 Jan 2018 05:35:01 +0000</lastBuildDate>
	<language>en-NZ</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.4</generator>

<image>
	<url>https://www.nationalrailwaymuseum.nz/wp-content/uploads/2018/01/cropped-cropped-favicon1-32x32.png</url>
	<title>Building Progress - The National Railway Museum of New Zealand</title>
	<link>https://www.nationalrailwaymuseum.nz/category/building-progress/</link>
	<width>32</width>
	<height>32</height>
</image> 
<site xmlns="com-wordpress:feed-additions:1">189844105</site>	<item>
		<title>Stage 1 Complete &#8211; Turntable Foundations and Retaining Wall</title>
		<link>https://www.nationalrailwaymuseum.nz/building-progress/stage-1-complete-turntable-foundations-and-retaining-wall/</link>
		
		<dc:creator><![CDATA[Brian Wheatley]]></dc:creator>
		<pubDate>Sun, 07 Jan 2018 11:17:41 +0000</pubDate>
				<category><![CDATA[Building Progress]]></category>
		<guid isPermaLink="false">https://www.nationalrailwaymuseum.nz/?p=236</guid>

					<description><![CDATA[<p>Some time back the turntable was completed but the legal aspects were not attended to. Thanks to diligent work by our Secretary, a Code of Compliance has now been issued by the Christchurch City Council. This means that we can now apply to NZTA (the Rail Regulators) for approval to use our track and turntable [&#8230;]</p>
<p>The post <a href="https://www.nationalrailwaymuseum.nz/building-progress/stage-1-complete-turntable-foundations-and-retaining-wall/">Stage 1 Complete &#8211; Turntable Foundations and Retaining Wall</a> appeared first on <a href="https://www.nationalrailwaymuseum.nz">The National Railway Museum of New Zealand</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img fetchpriority="high" decoding="async" class="size-medium wp-image-238 aligncenter" src="https://www.nationalrailwaymuseum.nz/wp-content/uploads/2018/01/stage-1-complete-300x191.png" alt="" width="300" height="191" srcset="https://www.nationalrailwaymuseum.nz/wp-content/uploads/2018/01/stage-1-complete-300x191.png 300w, https://www.nationalrailwaymuseum.nz/wp-content/uploads/2018/01/stage-1-complete-600x381.png 600w, https://www.nationalrailwaymuseum.nz/wp-content/uploads/2018/01/stage-1-complete.png 604w" sizes="(max-width: 300px) 100vw, 300px" /></p>
<p>Some time back the turntable was completed but the legal aspects were not attended to. Thanks to diligent work by our Secretary, a Code of Compliance has now been issued by the Christchurch City Council.</p>
<p>This means that we can now apply to NZTA (the Rail Regulators) for approval to use our track and turntable for the first time.</p>
<h4 style="text-align: center;"><span style="color: #008000;">Stage One is therefore now formally and legally complete!</span></h4>
<p>The post <a href="https://www.nationalrailwaymuseum.nz/building-progress/stage-1-complete-turntable-foundations-and-retaining-wall/">Stage 1 Complete &#8211; Turntable Foundations and Retaining Wall</a> appeared first on <a href="https://www.nationalrailwaymuseum.nz">The National Railway Museum of New Zealand</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">236</post-id>	</item>
		<item>
		<title>Grant Approved by Christchurch City Council</title>
		<link>https://www.nationalrailwaymuseum.nz/building-progress/cccgrant2017/</link>
		
		<dc:creator><![CDATA[Brian Wheatley]]></dc:creator>
		<pubDate>Sun, 07 Jan 2018 11:11:12 +0000</pubDate>
				<category><![CDATA[Building Progress]]></category>
		<guid isPermaLink="false">https://www.nationalrailwaymuseum.nz/?p=234</guid>

					<description><![CDATA[<p>Roundhouse Updates As a result of some hard work by our Chairman Bruce Shalders we have been granted $10,000 by the Christchurch City Council to &#8220;Re-Stage the NRM Building&#8221;, the intention being to divide the building into more manageable and affordable portions for construction. Bruce spent many hours on this application and met with Council [&#8230;]</p>
<p>The post <a href="https://www.nationalrailwaymuseum.nz/building-progress/cccgrant2017/">Grant Approved by Christchurch City Council</a> appeared first on <a href="https://www.nationalrailwaymuseum.nz">The National Railway Museum of New Zealand</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2 class="null">Roundhouse Updates</h2>
<p>As a result of some hard work by our Chairman Bruce Shalders we have been granted $10,000 by the Christchurch City Council to &#8220;Re-Stage the NRM Building&#8221;, the intention being to divide the building into more manageable and affordable portions for construction.<span id="more-234"></span></p>
<p>Bruce spent many hours on this application and met with Council staff a number of times. On another front this grant from the CCC is very important as it reflects support from them, support that is always asked about when applying for funds from other sources, especially Lotteries.<br />
We can now state that our local council is supporting our objectives.</p>
<p>The post <a href="https://www.nationalrailwaymuseum.nz/building-progress/cccgrant2017/">Grant Approved by Christchurch City Council</a> appeared first on <a href="https://www.nationalrailwaymuseum.nz">The National Railway Museum of New Zealand</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">234</post-id>	</item>
		<item>
		<title>Placement of Piles has Begun!</title>
		<link>https://www.nationalrailwaymuseum.nz/building-progress/placement-of-piles-has-begun/</link>
		
		<dc:creator><![CDATA[Brian Wheatley]]></dc:creator>
		<pubDate>Tue, 01 Aug 2017 09:59:05 +0000</pubDate>
				<category><![CDATA[Building Progress]]></category>
		<guid isPermaLink="false">https://nrmtestweb.wordpress.com/?p=115</guid>

					<description><![CDATA[<p>A rather exciting development has occurred recently, the Piles have begun to be driven under where the Roundhouse will be situated. Photos by John Mackenzie &#38; Pete Soundy.</p>
<p>The post <a href="https://www.nationalrailwaymuseum.nz/building-progress/placement-of-piles-has-begun/">Placement of Piles has Begun!</a> appeared first on <a href="https://www.nationalrailwaymuseum.nz">The National Railway Museum of New Zealand</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>A rather exciting development has occurred recently, the Piles have begun to be driven under where the Roundhouse will be situated. <em>Photos by John Mackenzie &amp; Pete Soundy.</em><span id="more-115"></span></p>
<figure id="attachment_119" aria-describedby="caption-attachment-119" style="width: 450px" class="wp-caption aligncenter"><img decoding="async" class="alignnone size-full wp-image-119" src="https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/piling1.jpg" alt="piling1" width="450" height="338" srcset="https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/piling1.jpg 450w, https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/piling1-300x225.jpg 300w, https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/piling1-400x300.jpg 400w" sizes="(max-width: 450px) 100vw, 450px" /><figcaption id="caption-attachment-119" class="wp-caption-text">The metal screw piles ready for placing.</figcaption></figure>
<figure id="attachment_120" aria-describedby="caption-attachment-120" style="width: 450px" class="wp-caption aligncenter"><img decoding="async" class="alignnone size-full wp-image-120" src="https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/piling2.jpg" alt="piling2" width="450" height="338" srcset="https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/piling2.jpg 450w, https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/piling2-300x225.jpg 300w, https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/piling2-400x300.jpg 400w" sizes="(max-width: 450px) 100vw, 450px" /><figcaption id="caption-attachment-120" class="wp-caption-text">Contractor making sure piles are vertical before screwing into the ground.</figcaption></figure>
<figure id="attachment_121" aria-describedby="caption-attachment-121" style="width: 450px" class="wp-caption aligncenter"><img loading="lazy" decoding="async" class="alignnone size-full wp-image-121" src="https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/piling3.jpg" alt="piling3" width="450" height="338" srcset="https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/piling3.jpg 450w, https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/piling3-300x225.jpg 300w, https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/piling3-400x300.jpg 400w" sizes="auto, (max-width: 450px) 100vw, 450px" /><figcaption id="caption-attachment-121" class="wp-caption-text">Held vertical, ready to be screwed into the ground.</figcaption></figure>
<figure id="attachment_122" aria-describedby="caption-attachment-122" style="width: 450px" class="wp-caption aligncenter"><img loading="lazy" decoding="async" class="alignnone size-full wp-image-122" src="https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/piling4.jpg" alt="piling4" width="450" height="299" srcset="https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/piling4.jpg 450w, https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/piling4-300x199.jpg 300w, https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/piling4-400x266.jpg 400w" sizes="auto, (max-width: 450px) 100vw, 450px" /><figcaption id="caption-attachment-122" class="wp-caption-text">A small amount of the piles driven down to date.</figcaption></figure>
<figure id="attachment_123" aria-describedby="caption-attachment-123" style="width: 450px" class="wp-caption aligncenter"><img loading="lazy" decoding="async" class="alignnone size-full wp-image-123" src="https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/piling5.jpg" alt="piling5" width="450" height="338" srcset="https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/piling5.jpg 450w, https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/piling5-300x225.jpg 300w, https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/piling5-400x300.jpg 400w" sizes="auto, (max-width: 450px) 100vw, 450px" /><figcaption id="caption-attachment-123" class="wp-caption-text">Some of the old concrete fill that had to be removed to get the piles past it.</figcaption></figure>
<figure id="attachment_124" aria-describedby="caption-attachment-124" style="width: 450px" class="wp-caption aligncenter"><img loading="lazy" decoding="async" class="alignnone size-full wp-image-124" src="https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/piling6.jpg" alt="piling6" width="450" height="299" srcset="https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/piling6.jpg 450w, https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/piling6-300x199.jpg 300w, https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/piling6-400x266.jpg 400w" sizes="auto, (max-width: 450px) 100vw, 450px" /><figcaption id="caption-attachment-124" class="wp-caption-text">The finished job, ready for inserting reinforcement bars and filling with concrete.</figcaption></figure>
<p>The post <a href="https://www.nationalrailwaymuseum.nz/building-progress/placement-of-piles-has-begun/">Placement of Piles has Begun!</a> appeared first on <a href="https://www.nationalrailwaymuseum.nz">The National Railway Museum of New Zealand</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">115</post-id>	</item>
		<item>
		<title>Museum Access Track</title>
		<link>https://www.nationalrailwaymuseum.nz/building-progress/museum-access-track/</link>
		
		<dc:creator><![CDATA[Brian Wheatley]]></dc:creator>
		<pubDate>Tue, 01 Aug 2017 09:46:07 +0000</pubDate>
				<category><![CDATA[Building Progress]]></category>
		<guid isPermaLink="false">https://nrmtestweb.wordpress.com/?p=92</guid>

					<description><![CDATA[<p>Recently the access track to the Museum was laid thanks to KiwiRail staff and members of the Canterbury Railway Society who came along after and laid the ballast. &#8211; Photos by Gordon Bartram &#38; George Wealleans</p>
<p>The post <a href="https://www.nationalrailwaymuseum.nz/building-progress/museum-access-track/">Museum Access Track</a> appeared first on <a href="https://www.nationalrailwaymuseum.nz">The National Railway Museum of New Zealand</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p style="text-align: left;">Recently the access track to the Museum was laid thanks to KiwiRail staff and members of the Canterbury Railway Society who came along after and laid the ballast. <em>&#8211; Photos by Gordon Bartram &amp; George Wealleans</em><span id="more-92"></span></p>
<figure id="attachment_94" aria-describedby="caption-attachment-94" style="width: 400px" class="wp-caption aligncenter"><img loading="lazy" decoding="async" class="alignnone size-full wp-image-94" src="https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/access-track-s.jpg" alt="access-track-s" width="400" height="274" srcset="https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/access-track-s.jpg 400w, https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/access-track-s-300x206.jpg 300w" sizes="auto, (max-width: 400px) 100vw, 400px" /><figcaption id="caption-attachment-94" class="wp-caption-text">The access track to the Museum building after being laid by KiwiRail staff.</figcaption></figure>
<figure id="attachment_95" aria-describedby="caption-attachment-95" style="width: 400px" class="wp-caption aligncenter"><img loading="lazy" decoding="async" class="alignnone size-full wp-image-95" src="https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/ballasting-s.jpg" alt="ballasting-s" width="400" height="274" srcset="https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/ballasting-s.jpg 400w, https://www.nationalrailwaymuseum.nz/wp-content/uploads/2017/08/ballasting-s-300x206.jpg 300w" sizes="auto, (max-width: 400px) 100vw, 400px" /><figcaption id="caption-attachment-95" class="wp-caption-text">Members of the CRS with their ballast train laying the ballast on the access track.</figcaption></figure>
<p>The post <a href="https://www.nationalrailwaymuseum.nz/building-progress/museum-access-track/">Museum Access Track</a> appeared first on <a href="https://www.nationalrailwaymuseum.nz">The National Railway Museum of New Zealand</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">92</post-id>	</item>
	</channel>
</rss>
